Pull out test method statement Job Name: Location: A method statement on the anchor tests mentioned under item (a) above is required to be submitted to this Department prior to the application for consent to the commencement of the cantilevered structure/hanger/curtain wall remedial# works. Such data can be used to choose an anchor type and Pull out testing for anchors and rebars General Information international Member of Construction Fixings Association (CFA-UK) as an Approved Anchors Tester During the year 2014. This document provides a method statement for applying ISOLATEK Type 400, a spray-applied fire-resistant coating, to structures at the LnT Realty Seawoods project to provide 2 hours of fire rating. It describes sampling at least 1% of each anchor type and size for pull-out testing. 3 Photos for each elevation of the building after repair: See Annex B 1. Jul 1, 2020 · The post-installed screw pull-out test: Development of a method for assessing in-situ concrete compressive strength Salam Al-Sabah b ASTM C900 Full Name ASTM C900 – Standard Test Method for Pullout Strength of Hardened Concrete Scope ASTM C900 is a standard test method for determining the pullout strength of hardened concrete. The purpose of such tests is to verify Where can I get the pull out test method statement? Citation preview LARSEN &TOUBRO LIMITED – ECC DIVISION PROCEDURE No- 04 Pile Load Test (pull out)-SP#3 QUALITY MANAGEMENT Bhilai Steel Plant-Expansion Project PAGE : METHOD STATEMENT - PULL OUT TEST OF PILE. Proof load tests performed in the confined What is the recommended pull-out test value for M20 Gr. 3) A construction procedure that describes how to set up the test equipment, conduct the test by incrementally loading a soil nail with a 10. 3 When planning pullout tests and analyzing test results, consideration should be given to the normally expected de-crease of concrete strength with increasing height within a 4 The boldface numbers refer to the list of references at the end of this test method. The test procedures This document provides a method statement for conducting a pull out load test of bored cast in situ piles for a power plant project in India. How long minimum time required for pull out test after installed the bolts PULL OUT TEST METHOD OF STATEMENT UJI TEGUH RESOURCES 11-33 AVENUE CREST, JALAN JUBLI PERAK 22/1, SEKSYEN 22, 40150 SHAH ALAM, SELANGOR DARUL EHSAN. 1. View and download Pull Out Test for free. Also, learn other NDT tests which are used to check the hardened Concrete. Pre-conditions The anchors to be tested have been or will be purchased through Fixmart. 2. The scope of work includes conducting tensile, lateral, and pull-out pile load tests according to Indian standards to determine pile bearing capacities and submit a report. The method statement should be provided by the laboratory conducting the testing. LARSEN &TOUBRO LIMITED – ECC DIVISION PROCEDURE No- 04 Pile Load Test (pull out)-SP#3 QUALITY MANAGEMENT Bhilai Steel Plant Among the advantages of this method of testing, it can be pointed out to possibility to measure the pull-out ultimate strength and the load-slip curve directly without the need to refer to conversion formulas. DEFIX CONCRETE PRODUCTS SDN BHD (986490-X) No. *A Summary of Changes section appears at the end of this standard. The objective of this test method is to measure the working and ultimate capacities of a rock bolt anchor. 1 These test methods cover procedures for determining the tensile strength of a section of portland cement-based plaster, the bond strength between portland cement-based plaster and a solid plaster base, or the fastener pull-out or lath pull-over strength for portland cement-based plaster bases over framing in either an exterior (stucco) or interior application. See Commentary C1. Equipment required includes a hydraulic jack, pressure gauge, and dial gauge, with detailed instructions for setup, load Method Statement for Testing of Rebars The rebar should be installed as per the Hilti guide lines without compromising on the cleanliness of the hole, hole diameter, depth, chemical volume injected and the curing time Mount the Hydraulic Cell over the rebar on the concrete surface. Itis particularly efficient for high strength concrete (60+80 MPa). If pressure is applied to the contact receptacle (A) by hand during the pull-out test, this can lead to measurement errors, especially with small nominal cross-sections. Reinforcement steel bar pull-out test The tensile test of steel bar is the field test of the anchoring force. If results from pull force tests are within an allowed range, it assures that the proper crimp force has been applied during the crimping process. The tests are performed using an Enerpac hydraulic hollow Pull-Out Test (POT) by Waldevar ensure structural integrity and reliability of PV installations, optimizing foundation systems for long-term stability, enhanced performance, and cost-efficiency. By using a previously established relationship, the measured ultimate pullout load is used to estimate the in-place compressive strength of the concrete. Mar 1, 2019 · scope: 1. Field of applications Anchors Ideally, a pull-out test should be performed without manual intervention after inserting the crimp contact and clamping the wire. These test methods cover procedures for determining the tensile strength of a section of portland cement-based plaster, the bond strength between portland cement-based plaster and a solid plaster base, or the fastener pull-out or lath pull-over strength for portland cement-based plaster bases over framing in either an exterior (stucco) or Dec 22, 2024 · The Pull-Out Test is conducted to evaluate the uplift resistance of a pile under tensile loads. The construction site pull-out tests are carried out and evaluated using valid regulations in accordance Feb 24, 2014 · 5. The pullout test measures the force needed to extract an embedded insert from a concrete mass. 1 Equipment and Test Set up. pdf), Text File (. The insert can be either cast into Pull test standards and methods Background The quality of a crimp joint depends on the mechanical strength of the joint as well as its electrical conductivity. Jan 30, 2023 · 1. This is provided as part of the product submission for specifier approval. It describes the test equipment used, including load capacities of up to 25kN and 598kN. In this context, this paper seeks to develop an in-situ test method as an alternative to the available techniques to assess in-situ compressive strength of concrete. 4 Method statement adopted for and records of results of all proof test - Proof test carried out: Pull-off tests for repair of rendering/tiling and patch repair of concrete This document provides a method statement for performing pull out testing of anchor foundations for a 400kV transmission line project in Botswana. Chu and others published A new method for pull out test of reinforcing bars in plain and fibre reinforced concrete | Find, read and cite all the research you need on ASTM E754-80(2022) - SIGNIFICANCE AND USE 5. The document provides guidelines and procedures for conducting hydraulic pull-out tests to determine the tensile load capacity of construction anchors, rebars, and threaded rods installed in concrete. This test is crucial for structures subjected to forces that can pull the pile out of the ground, such as wind forces, tension in guy wires, or uplift in foundations due to water pressure or expansive soils. 3 With modification (by incremental loading)) This procedure is in accordance BS5080: Part 1: 1993 with the following modification: BS5080 requires testing until failure, this procedure only tests to the stated load. Created Date7/1/2024 9:05:03 AM The aim of the anchor pull-out tests is to determine the load-bearing capacity of the selected washer anchor in the project-specific fastening substrate. CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Note: The abovementioned practice should be prohibited as it will produce false result. METHOD STATEMENT OF PULL-LOAD TEST BY USING LOAD CELL WITH HYDRAULIC JACK (BS 5080: Part 1: 1993 Cl. Each representative anchor should be tested by pull-out test to demonstrate that its pull-out capacity is not less than 1. The pile load test Pull Out Test (Anchor)HAT 30 Method Statement_ac-2a - Free download as PDF File (. Some commonly accepted method statements specifying the testing requirements, apparatus setup, testing procedures, acceptance criteria and presentation of results are provided in Appendices A to C: The geotechnical standards set out in this Geoguide are primarily for the use of high yield deformed steel bars installed by the drill-and-grout method for reinforcing soil cut slopes, retaining walls, fill slopes, excavations, disturbed terrain and natural hillsides. It outlines the product storage, substrate preparation, application techniques, quality Is the combination of anchor and base material missing from the technical documentation you're using? Or are you looking to proof load fasteners as part of installation quality documentation? Let the Hilti anchor site testing service help you determine missing resistance values or provide the basis for your assessment of installation quality. A detailed procedure for anchor pull-out tests, covering equipment, preparation, testing, and acceptance criteria. 25MWp solar power plant in Andhra Pradesh. It details the applicable standards, required equipment, preparation steps, loading procedures, and data recording methods. The representative carrying out the test will not install any anchors A walk through Structural Applications In this webinar, we will cover a bit more in pull-out test, which is a crucial part in the workflow of industry. A large Jan 1, 2025 · Pull-out test is the most commonly used test type to obtain the bond strength. It can be done using either a destructive pull-out test or a non-destructive proof load test. 5 times the recommended load to each anchor bolt and monitor for any failure. Sep 12, 2013 · This document outlines the method for conducting pull-out tests on anchor bars and rock bolts. 0. Load is gradually applied and maintained for 1 minute to observe The document provides a method statement for conducting pull out tests of anchors. Concrete Pull out Test In this article, we discuss the procedure of concrete pull out test and its use. Note: Option A Note: Option B is highly recommended. Browse the public library of over 100,000 free editable checklists for all industries. Inthis case, itmay be convenient to combine thultrasonic/pull-out methods, or else, the ultrasonic/hardness/pull-out methods. Pullout is made through a counterpressure with dimensions as shown in Pull Out Testing Methodology Ultimate Load Tests for Rebar Dowels - Free download as PDF File (. pdf) or read online for free. 3 The pull test may be used to provide a quantitative measure of the relative performance of different anchor systems in the same rock type. References This Method Statement has been written in accordance with the recommendations contained in fib technical report bulletin 14, especially chapter 8: “Practical execution and quality control” as well as with the advice contained in ACI 440. The document emphasizes the importance of determining the actual carrying 2. From 1st Aug 2023 onwards, you will need to know the Proof Load and a SO# to schedule onsite testing. The document provides guidelines and procedures for conducting pull-out tests on concrete anchors using Fischer Hydrajaws pull-out testers. Pull-off tests for Quality Control purposes should be performed according to EN 1542 Dec 4, 2015 · Their strengths are measured using the pre-installed pull-out method, the post-installed pull-out method and the standard cube compression strength test. 1 This test method covers determination of the pullout strength of hardened concrete by measuring the force required to pull an embedded metal insert and the attached concrete fragment from a concrete test specimen or structure. The PSP test is proposed based on the modified pullout testing of post-installed screw. May 8, 2020 · The pull-out test, which started to be regarded as a legitimate method in the 1970s, consists of pulling hardened concrete using a metal rod that’s been installed in the concrete. Thepull-out method is een toexhibit greater sensitivity andprecision in the results. Overview of Concrete Pull Off Test Standards Concrete pull off tests measure the bond strength between the concrete surface and overlays, coatings, or other materials. Jun 30, 2010 · The pull-out test, which is recommended by RILEM-FIB-ACI, is a simple method of assessing the bond between reinforcing bars and concrete, and understanding the influencing factors. Concrete Technology Reading time: 1 minute What is pullout tests on hardened concrete? The fundamental principle behind pull out testing is that the test equipment designed to a specific geometry will produce results (pull-out forces) that closely correlate to the compressive strength of concrete. (Notes: Method statement for sub-activity grouting & pull-out testing may be prepared separately). Standard Test Method for Pullout Strength of Hardened Concrete 1. Selection of Test Points The location of test points for the pull out test shall be selected by the engineer before testing works start. 2. Preparation I. 6 & 7. It outlines the test plan, controlling specifications, preparatory work, equipment, and test procedures. METHOD STATEMENT FOR HYDRAULIC PULL-OUT TESTfCaen ned Method Statement for Hydraulic Pull-Out Test OBJECTIVE The purpose of site test IS to validate installation/adequacy of the installation of fixings This is usually proposed by the consultants to validate the quality of work by installers or contractors, GUIDELINES 1. General Purpose Anchor Testing of chemical and mechanical anchors and reinforcing bars for tensile test loads up to 145kN, our testing as per the CFA-UK report format, method statements. It details the equipment used, including different models of cylinders with varying capacities. This chapter reviews the history of the development of this test method, including the various analytical studies conducted to understand the Hilti Pull out testing methodology - Free download as PDF File (. This method statement describes the systematic procedures and methods for the investigation and evaluation of concrete surfaces. Anchors are installed into concrete then fitted with hexagon bolts and secured in the pull out tester jaws. Tests require a minimum of 10-12 samples per variable for 95% confidence level results. It describes the tester equipment, installation procedure of anchors, and testing process. It outlines the equipment needed including a coring machine, dolly, epoxy resin, and pull-off tester. Tests may be made to determine the ultimate load or to apply a proof load to verify proper installation. An independent laboratory will apply a tensile load of 1. A well-conducted pull-out test provides valuable data for engineers, helping them verify the Jan 1, 2021 · Thus, the reliability of the estimated concrete strength is always a questionable issue. It outlines the purpose, references, abbreviations, general safety requirements, roles and responsibilities, tools and equipment, work method, inspection process, emergency response, and record keeping requirements for conducting the pull out tests The Work Method Statement outlines the procedures for conducting pullout tests on driven piles for the Del Norte project by Powerway Renewable Energy Co. After testing, a report is provided containing test data, results, and verification of anchor resistances calculated for design. com f METHOD OF STATEMENT 1. We would like to show you a description here but the site won’t allow us. For Mar 12, 2019 · The document provides specifications for conducting pile load testing for a 1. 2R-08. This article should clear up when and how to carry out anchor 'pull' testing. This method ensures that structural elements can withstand the expected loads in different construction and engineering scenarios. Jul 14, 2025 · Onsite testing helps determine the design resistance of the base material and ensures the right anchor system is selected for the installation. It includes: 1) A general description and objectives of the test method. 4 Marked-up plans showing the demarcation of works requiring approval and consent N/A 1. 8, Jalan PJS 5/26, Taman Desaria PJS 5, Petaling Jaya 46000 Selangor, Mal This method statement outlines the procedure for conducting a pullout load test on rock bolts, specifically for slope stabilization at the IKTR project. May 12, 2022 · Anchor testing is often conducted unnecessarily, or not conducted at all. Load for the “preliminary test” (to be applied on the jobsite) Characteristic value of tensile action Factor depending on the application and the typology of the fastening Pull Out Test Method Statement - Free download as PDF File (. Hilti -Pull Out Test Report-sample - Free download as PDF File (. It includes details on the equipment used for the tests, calibration certificates, installation procedures, a parts list, and a cover letter summarizing and transmitting the test results Corresponding method statement on the strength tests is required to be submitted to the Buildings Department (BD) for agreement. Learn more about it here. Use high strength, short-length bolts (6-8 ft) to minimize rock mass failure during tests. provides pull out testing according to British Standard (BS 5080) and In-House method Tensile proof load test (Pull out test) Shear proof load test HOKLAS certified pull out test method statement In Hong Kong, HOKLAS certified laboratory is needed in order to carry out pull out test otherwise the test report may not recognized by authorities. The document outlines equipment used, test setup, procedures, reporting requirements, and guidelines on number 4. Scope 1. It will involve installing a test pile, preparing the test area, setting up testing equipment to apply and measure loads, conducting the test according to specifications, and assessing the safe load capacity of the pile. Hong Kong Testing Co. It outlines mapping the project area of approximately 6 acres of barren land. Ultimate bearing capacity criteria Data sorting: draw the relationship curve of the amount of pull-up (Q-s) and the relationship curve of the amount of pull-up-logarithm of time (s-lgt). The on-site pull-out test for anchors and rebar should follow the BS5080: Part 1: 1993 test method. It covers requirements for ultimate load tests to either establish the suitability of a fixing in a Ezzein and Bathurst (2011a, 2014) developed a pullout box apparatus and a test method to investigate soil-geosynthetic interaction during pullout test using transparent synthetic soil. The data developed from these tests provide the roof system manufacturer, design professional, and other practitioners with pullout resistance values for the specific fastener installed into the load resisting material of the deck. 8 Rod with Hilti HIT-RE 500 V4? This document outlines the scope of works for conducting a pull out test of a soil nailing. The apparatus possesses a glass bottom and the transparent soil permits real life photographs of the inserted geosynthetic specimen to be taken. A superscript epsilon (e) indicates an editorial change since the last revision or reapproval. This is largely due to the fact the ETA values are based on years of laboratory testing and take into account a multitude of factors that a short-term on-site test simply cannot. The optimum fastening type for the building project can be determined by taking the individual setting/assembly process into account. METHOD STATEMENT FOR HYDRAULIC PULL-OUT TESTfMethod Statement for Hydraulic Pull-Out Test OBJECTIVE The purpose of site tests may be either: a) Investigative Test (Mock Up) - To establish the suitability of fixing and/or admissible loads in a particular base material. Hydraulic pull tests need accurate load and displacement measurements, with specific tolerances outlined This document outlines the procedure for testing the strength of anchor bolts installed in a concrete beam. H. Test results are used to confirm design The on-site pull-out test for anchors and rebar should follow the BS5080: Part 1: 1993 test method. Mobile: 012 – 9382 951 (Iswan) Email: ujiteguh1@yahoo. HILTI PULLOUT TEST SAMPLE This document provides a method statement for testing the bond strength of an epoxy floor surface using a coring and pull-off test method. 1 This test method is intended to provide a simple inexpensive means of generating conservative, comparative data on pullout strengths of various ties and anchors used with different types of masonry units and mortars. A test report will be kept on site for inspection. Qualified personnel use calibrated equipment to perform the tests in the customer's presence according to specified requirements. The test procedures are This document provides a method statement for conducting an initial pile load test, including vertical (compression), lateral, and pull out tests on test piles. 2) A list of the required plant, equipment, manpower and their roles for conducting the test. Anchor systems may be different mechanical anchors or different bond materials or lengths for grouted anchors. Appendix shall include work program for soil nailing, product catalogues, photos and test certificates, catalogues & photos for drilling machine and accessories, drawings/sketches illustrating sequence of works, etc. 拉力測試 瓷磚拉力測試 瓷磚拉力測試 In-house method TIL-P-001 ( 鋸切方法 或 取心方法 ) * 瓷磚膠粘劑拉力測試 瓷磚膠粘劑拉力測試 In-house method This technical document provides the method for conducting the pull-out test for rock bolts and rock anchors. 5 times the recommended tensile load as specified by the anchor manufacturer. It details the test purpose, standard references, safety recommendations, design and test loads, testing methods, and the process for analyzing test results. Essentially, this test quantifies the force applied on a metal insert within solidified concrete to extract it out. Two primary standards govern these tests: ASTM D4541 and ISO 4624. The document outlines a method statement for conducting a pull-out load test on SDA to verify its resistance and load-displacement behavior under field conditions. Method Of Statement for Hydraulic Jack Testing (1) - Free download as PDF File (. 0 Purpose This standard provides procedures used in the field to test the pullout resistance of all types of roofing fasteners. Scope * 1. All anchors to be installed by the contractor prior to testing. Pull-out test result should meet the minimum required Design Load. The test procedure involves drilling a hole, installing the anchor, applying the tightening torque, and then applying increasing tensile loads until the required proof load is reached. This test method is recommended for such use until economical, improved methods can be developed to simulate service conditions more . Here in this article we also provide information regarding semi-destructive test like LOK Test, CAPO Test, and pull off test. 1 Rock bolts are used for support in a variety of mining and civil engineering situations. 8. After 48-72 hours of rebar planting, the tension meter (Jack) can be used to carry out the drawing test of the reinforced bar. 0 PULLOUT TEST OF PILE: 1. Method Statement for Fischer Hydrajaws Pull Off Tester OBJECTIVE The purpose of site tests may be either: a) Investigative Test (Mock Up) - To establish the suitability of fixing and/or admissible resistance in a particular base material. The report 1. A Pull Out Test Report (Refer To The “Standard Field Test Procedure For Determining The Withdrawal Resistance Of Roofing Fasteners” For Full Documentation) REPORT RESULTS ON REVERSE SIDE. 1. Pull-Out Test The Pull-Out Test is a semi-destructive testing method that directly assesses the in-situ strength of concrete by calculating the force necessary to remove a specifically inserted insert from the concrete mass. Researchers have conducted different types of pull-out tests to analyze the bond strength of rebars in UHPC. Ideal for construction and structural engineers. Jun 12, 2023 · 1. In order to Jun 19, 2024 · The pullout test is one such method used to assess this integrity. The compressive strength of the in-place concrete is measured by calculating the force required to pull out the concrete fragment from a test specimen or structure OP-3-74. It was concluded that the maturity method and pullout testing are the two preferred test procedures for estimating the in-place strength of concrete in a highway structure. This procedure provides guidance for testing chemical anchors and rebar dowels away from laboratory conditions to properly assess their performance. An on-site test’s results can never be used to trump the findings from an ETA. The pull-out bearing limit force is comprehensively determined according to the following method: 1. We will include the details of pull-out test, common misunderstanding & our advanced solution. The test procedures describe applying load through a calibrated hydraulic jack and measuring displacement using calibrated dial Hilti provides on-site anchor pull-out testing services to determine anchor load capacities and verify structural strength. It involves measuring the force required to pull an embedded metal insert, along with the attached concrete fragment, out of a concrete test specimen or structure. Preparatory work includes The method evaluates rock bolt anchor working and ultimate capacities, excluding full roof support assessment. Feb 8, 2018 · PDF | On Feb 8, 2018, S. The test procedures are Oct 8, 2024 · Pull-out testing is an essential process used to determine the holding power and integrity of anchors and bolts in various materials, most commonly concrete and steel. Furthermore, the state-of-the-art surface preparation methods are introduced and briefly explained. The test aims to verify the capacity of rock bolts by applying a specified test load and measuring displacement. ASTM D4541 addresses the method for pull out strength testing 8-2 Reasons for Static Load Testing and Pile Dynamic Analysis Static Load Tests measure the response of a pile under an applied load and are the most accurate method for determining pile capacities. Feb 23, 2024 · Pull-out test is a method used to assess the coupling strength of a hole-based fixing into concrete. 2 The pullout systems Invented at the Danish Technical University (DTU) in the late 1960’s and 1970’s, [1, 2], the LOK-TEST (the Danish name for “Punch-Test”) uses a disc cast into the fresh concrete, and the CAPO-TEST (Cut And Pull Out- Test) uses a ring expanded in an undercut recess in existing concrete, [3, 4]. It explains the step-by-step process for conducting rebar and This document provides a 3-page method statement for conducting pull-out tests of chemical anchors along with test results from installing and testing a 16mm threaded bar using a Hilti HIT RE-500 resin anchor. Feb 1, 2024 · 1. They can determine the ultimate failure load of a foundation pile and determine its capacity to support the load without excessive or continuous displacement. These tests ensure your projects don’t peel away faster than a sunburn on a summer day. The testing procedure involves coring through the epoxy and into the concrete, gluing a dolly to the epoxy surface, attaching the pull-off tester to apply Pull Test Statement for Anchor Testing on Site This is for anchors tested either by ourselves or by the manufacturer. This test, as described in ASTM C900 and EN 12504-3, provides a very trustworthy estimate of concrete compressive strength, especially during the early curing period or This document provides a method statement for conducting a pull out test of a pendant system using a Hydrajaw pull out tester. The document describes the methodology for performing pullout tests of rebar and anchors using Enerpac hydraulic cylinders. Method Statement For Pull Out Test [do36kq16j6oj]. The test aims to ensure that the SDA meets the necessary safety factors and design capacity, with specific The tensile pull-off method for adhesion testing, as outlined in ASTM D 4541 and similarly in BS EN ISO 4624, involves gluing a test dolly to the coated surface and then pulling the dolly by exerting a force perpendicular to the surface in an effort to remove the dolly with the coating from the substrate. txt) or read online for free. 1 These test methods cover procedures for static tensile and shear testing of post-installed and cast-in-place anchorage systems in members made of concrete or members made of solid, hollow, or grout-filled masonry and related materials. , Ltd. The objectives of the tests are to establish anchor suitability, confirm manufacturer design resistance, or validate anchor installation quality. ycwj xck pcg yiof wbkn efcmrx ocqm efl qdti ecqcltwk gqfehsg ccvxk bnnls ywuyses ncwivn